Burlington GO Station
Roof Assembly SRP AirOutshield ROOF was installed beneath the zinc standing seam roofing to function as the secondary drainage plane and vapour-permeable air barrier, mechanically fastened to the roof deck and covered with zinc panels. In the second phase, SRP AirOutshield SA280 was adhered to the substrate, left exposed over the winter, and later finished…
Read More